Skip to main content
ASTRAKE
Navigation
Arthanir ERP
Suite 03 · EPC, eMB & RA Billing

Dimensional eMB, PVC escalation, and 8-head RA billing.

Purpose-built for Indian infrastructure, civil engineering, railway, and PSU government contractors. Eliminates spreadsheet errors across tender EMD/BG tracking, dimensional measurement recording, cumulative RA billing, and Deposit Works centage.

Enforced statutes & standards CPWD Works Manual & NHAI Standard Bidding Document Ind AS 115 Revenue from Contracts with Customers BOCW Cess Act (1%) & CGST Section 51 (2% PSU GST-TDS)

Built for audit-ready precision.

3-Tier eMB Workflow

4-decimal dimensional measurements with JE → AE → EE lock

Record Nos × Length × Breadth × Depth with explicit deduction rows, chainage references, and mandatory three-tier engineering verification before billing.

8-Head Progressive RA Bills

Cumulative work value, PVC & statutory recoveries

Calculate Previous, Current, and Up-to-Date bills, apply RBI WPI/CPI Price Variation formulas, and deduct retention, mobilisation advance, FIM, TDS, GST-TDS, and BOCW cess.

Ind AS 115 & WBS Budgets

Percentage-of-completion WIP & 4-stage budget control

Recognise unbilled contract assets vs. advance billing liabilities under Ind AS 115 and enforce WBS budget limits across Sanction, PR, PO, and Actual stages.

How teams run EPC, eMB & RA Billing in practice.

01

Baseline tender BOQ, Rate Analysis & 4-level WBS budget

Import contract BOQ items, build material/labour/plant rate analyses, track EMD/BG instruments, and sanction WBS budgets.

02

Record site diaries & 3-tier eMB measurements

Field engineers log daily progress, weather, hindrances (EoT), and dimensional eMB rows verified through JE → AE → EE sign-off.

03

Generate progressive RA bills & post Ind AS 115 WIP journals

Convert approved eMB books into cumulative RA bills with PVC escalation and all 8 statutory/contractual deductions.

Core controls in Suite 03.

CPWD / NHAI 3-TIER eMB

4-Decimal Dimensional Measurement & JE/AE/EE Lock

Records Nos × Length × Breadth × Depth with explicit deduction lines, chainage/drawing references, and mandatory 3-tier Junior Engineer (JE) -> Assistant Engineer (AE) -> Executive Engineer (EE) verification.

8-HEAD PROGRESSIVE RA BILLS

Cumulative Previous/Current Quantities, PVC & Statutory Recoveries

Computes Previous, Current, and Up-to-Date values, applies 6-index PVC escalation (Labour, Steel, Cement, POL Fuel, Material), and deducts IT-TDS, GST-TDS, 1% BOCW Cess, Retention, Mobilization Advance, and Client FIM recoveries.

IND AS 115 & 4-STAGE WBS BUDGETS

Percentage-of-Completion WIP & Pre-Encumbrance Control

Automatically values Unbilled Contract Assets vs. Advance Billing Liabilities under Ind AS 115 and enforces 4-stage WBS budget ceilings (Sanctioned -> PR -> PO -> Actual).

Frequently asked questions.

Can an RA bill be generated from unapproved eMB measurement lines?

No. Measurement lines must complete Junior Engineer recording, Assistant Engineer check, and Executive Engineer approval before they can be pulled into a Progressive RA Bill.

How does Price Variation Clause (PVC) escalation work?

You configure base and current indices for Labour (CPI-IW), Steel, Cement, Bitumen/POL, and Other Materials along with contract weightage percentages to compute exact escalation bills.

Does it track Extension of Time (EoT) claims from site hindrances?

Yes. The Site Hindrance Register logs utility-shifting, land-acquisition, or weather delays with overlapping-day deduplication to substantiate contractual EoT claims.

Evaluate EPC, eMB & RA Billing with your own workflows

Runs on your servers. Managed by Arthanir or an official partner. Request a live online walkthrough or an in-person session at your office.