4-decimal dimensional measurements with JE → AE → EE lock
Record Nos × Length × Breadth × Depth with explicit deduction rows, chainage references, and mandatory three-tier engineering verification before billing.
Purpose-built for Indian infrastructure, civil engineering, railway, and PSU government contractors. Eliminates spreadsheet errors across tender EMD/BG tracking, dimensional measurement recording, cumulative RA billing, and Deposit Works centage.
Record Nos × Length × Breadth × Depth with explicit deduction rows, chainage references, and mandatory three-tier engineering verification before billing.
Calculate Previous, Current, and Up-to-Date bills, apply RBI WPI/CPI Price Variation formulas, and deduct retention, mobilisation advance, FIM, TDS, GST-TDS, and BOCW cess.
Recognise unbilled contract assets vs. advance billing liabilities under Ind AS 115 and enforce WBS budget limits across Sanction, PR, PO, and Actual stages.
Import contract BOQ items, build material/labour/plant rate analyses, track EMD/BG instruments, and sanction WBS budgets.
Field engineers log daily progress, weather, hindrances (EoT), and dimensional eMB rows verified through JE → AE → EE sign-off.
Convert approved eMB books into cumulative RA bills with PVC escalation and all 8 statutory/contractual deductions.
Records Nos × Length × Breadth × Depth with explicit deduction lines, chainage/drawing references, and mandatory 3-tier Junior Engineer (JE) -> Assistant Engineer (AE) -> Executive Engineer (EE) verification.
Computes Previous, Current, and Up-to-Date values, applies 6-index PVC escalation (Labour, Steel, Cement, POL Fuel, Material), and deducts IT-TDS, GST-TDS, 1% BOCW Cess, Retention, Mobilization Advance, and Client FIM recoveries.
Automatically values Unbilled Contract Assets vs. Advance Billing Liabilities under Ind AS 115 and enforces 4-stage WBS budget ceilings (Sanctioned -> PR -> PO -> Actual).
No. Measurement lines must complete Junior Engineer recording, Assistant Engineer check, and Executive Engineer approval before they can be pulled into a Progressive RA Bill.
You configure base and current indices for Labour (CPI-IW), Steel, Cement, Bitumen/POL, and Other Materials along with contract weightage percentages to compute exact escalation bills.
Yes. The Site Hindrance Register logs utility-shifting, land-acquisition, or weather delays with overlapping-day deduplication to substantiate contractual EoT claims.
Runs on your servers. Managed by Arthanir or an official partner. Request a live online walkthrough or an in-person session at your office.