1. 4-Decimal Dimensional eMB Recording & 3-Tier Engineering Sign-Off
Civil, highway, and railway contracts require recording physical measurements as Nos × Length × Breadth × Depth / Height with explicit deduction rows (for openings, ducts, or voids) before deriving net payable BOQ quantities. In Arthanir, net dimensional quantities are calculated to 4 decimal places and locked through a mandatory 3-tier verification chain: Junior Engineer (JE) → Assistant Engineer (AE) → Executive Engineer (EE).
2. WPI/CPI Price Variation Clause (PVC) & 8-Head RA Bill Recoveries
Price Variation Clause worksheets evaluate base versus current wholesale and consumer price indices across Labour, Steel, Cement, POL/Fuel, Bitumen, and General Material components after subtracting fixed contract percentages. Progressive RA billing then computes cumulative Up-to-Date versus Previous abstract values and applies all 8 statutory and contractual deductions: Income Tax TDS, Section 51 GST-TDS, 1% BOCW Labour Cess, Security Deposit Retention, Mobilization Advance Recovery, Secured Advance Adjustment, Client FIM Recovery, and Penalty/LD.
3. Ind AS 115 Percentage-of-Completion WIP Valuation
At period close, the project accounting ledger compares actual cumulative cost incurred against total estimated cost at completion to compute stage of completion and recognise either an Unbilled Contract Asset (WIP) or an Advance Billing Liability under Ind AS 115.