Schedule III Financial Accounting, General Ledger & BRS
Companies Act 2013 Schedule III Division II (Ind AS) chart of accounts, integer-paise double-entry vouchers, 5-axis cost allocation, and automated bank reconciliation.
Financial accounting, GST & TDS compliance, EPC project billing, procurement, inventory, manufacturing, fixed assets, and plant operations share a single transactional database on your servers.
Companies Act 2013 Schedule III Division II (Ind AS) chart of accounts, integer-paise double-entry vouchers, 5-axis cost allocation, and automated bank reconciliation.
Exact CGST/SGST/IGST split, Income Tax TDS (194C/194J/194I/194Q + Section 206AA 20% rule), PSU Section 51 GST-TDS, e-Invoice & E-Way Bill payloads, and GSTR-2B/26AS reconciliation.
CPWD/NHAI 3-tier Electronic Measurement Books (JE → AE → EE), BOQ Rate Analysis, Price Variation Clause (PVC) escalation, 8-head Progressive RA Bills, and Ind AS 115 WIP valuation.
End-to-end PR → RFQ → L1 Comparative Statement → PO → Weighbridge GRN → Automated 3-Way Match verification and MSMED Act 45-day / Section 43B(h) compliance.
Multi-warehouse bin ledger, Moving Weighted-Average & Standard Costing, exact-paise Landed Cost apportionment, CARO 2020 Clause 3(ii) physical verification, and barcode label printing.
Multi-level Bill of Materials (BOM) cost rollups, work-centre routing, structural steel nesting & remnant yield tracking, Mill Test Certificate (MTC) heat traceability, and CGST Section 143 Job-Work challans.
Simultaneous Companies Act 2013 Schedule II (SLM/WDV) and Income Tax Act 1961 Section 32 (Block WDV with <180-day 50% rule) depreciation, CARO 2020 Clause 3(i) FAR, and 18 CAG Statutory Audit Dossiers.
ISO 9001:2015 & ISO 27001:2022 SHA-256 evidence registers, Clause 8.4 Approved Vendor List (AVL) scorecards, Plant HMR/KM/HSD logbooks with internal hire absorption, and Client Free-Issue Material (FIM) penal recovery reconciliation.
Summary checklist of core ledgers, statutory controls, and transaction codes included across your Arthanir deployment.
| Suite | Functional Scope | Core Capabilities | Statutory & Control Focus |
|---|---|---|---|
| Suite 01: Financial Accounting | Schedule III Financial Accounting, General Ledger & BRS | 3 capabilities | Companies Act 2013 Schedule III Division II (Ind AS) 5-level Chart of Accounts, exact-paise double-entry vouchers, and automated Bank Reconciliation Statements. |
| Suite 02: GST & Statutory Tax | GST, Direct Tax TDS/TCS, Section 51 PSU GST-TDS & E-Invoicing | 3 capabilities | Deterministic CGST/SGST/IGST split, Income Tax TDS (194C/194J/194I/194Q + 206AA 20% non-PAN rule), PSU Section 51 GST-TDS, e-Invoicing, and GSTR-2B/26AS reconciliation. |
| Suite 03: EPC, eMB & RA Billing | GovCon & EPC Works: eMB, Tender Rate Analysis, PVC & Progressive RA Billing | 3 capabilities | CPWD/NHAI 3-tier Electronic Measurement Books (JE -> AE -> EE), BOQ Rate Analysis, Price Variation Clause (PVC) escalation, 8-head Progressive RA Bills, and Ind AS 115 WIP valuation. |
| Suite 04: Procurement & MSME 43B(h) | Procurement, Comparative Statement (CST), 3-Way Match & MSME Section 43B(h) | 3 capabilities | End-to-end PR -> RFQ -> L1 Comparative Statement -> PO -> Weighbridge GRN -> Automated 3-Way Match AP verification and MSMED Act 45-day / Section 43B(h) compliance. |
| Suite 05: Inventory & Landed Cost | Multi-Location Inventory, Moving Weighted-Average & Landed Cost Apportionment | 3 capabilities | Multi-warehouse bin ledger, Moving Weighted-Average & Standard Costing with PPV, exact-paise Landed Cost apportionment, CARO 2020 Clause 3(ii) physical verification, and ZPL/ESC-POS barcode printing. |
| Suite 06: Manufacturing & BOM | Manufacturing Multi-Level BOM, Steel Cutting Plan Yield & Section 143 Job-Work | 3 capabilities | Multi-level Bill of Materials (BOM) cost rollups, work-centre routing, structural steel plate/section nesting & remnant yield tracking, Mill Test Certificate (MTC) heat traceability, and CGST Section 143 Job-Work challans. |
| Suite 07: Fixed Assets & Audit | Fixed Assets Dual-Act Depreciation, Ind AS 12 Deferred Tax & 18 CAG Audit Packs | 3 capabilities | Simultaneous Companies Act 2013 Schedule II (SLM/WDV) and Income Tax Act 1961 Section 32 (Block WDV with <180-day 50% rule) depreciation, CARO 2020 Clause 3(i) FAR, and 18 CAG Statutory Audit Dossiers. |
| Suite 08: ISO, Plant & Client FIM | ISO 9001/27001 Evidence Registers, Plant & Machinery Logbooks & Client FIM Reconciliation | 3 capabilities | ISO 9001:2015 & ISO 27001:2022 SHA-256 evidence registers, Clause 8.4 Approved Vendor List (AVL) scorecards, Plant HMR/KM/HSD logbooks with internal hire absorption, and Client Free-Issue Material (FIM) penal recovery reconciliation. |
Schedule a live online walkthrough or an in-person session to review end-to-end workflows from tender BOQ and weighbridge GRN to Schedule III financial statements.