Skip to main content
ASTRAKE
Book Demo
Navigation
Multi-site systems engineering

Multi-site systems engineering across clinical, industrial, and campus infrastructure.

When organizations deploy across multiple hospitals, manufacturing plants, or campuses, Astrake’s engineering team architects the full local hardware, protocol bridges, and multi-entity governance into one cohesive rollout.

Multi-system industrial plant and enterprise facility deployment
Deployment Topology
Autonomous Site LAN + HQ Sync
Hardware Custody
Customer-Owned Premises
Field Interfaces
RTSP, HL7, RS-232 & Wi-Fi 6
Commissioning
Kolkata Principal Engineering

Autonomous site nodes with consolidated head-office governance.

Every plant, hospital wing, or branch operates independently on its own local area network, synchronizing encrypted financial and compliance records asynchronously when upstream connectivity is active.

Clinical Site Node

Hospitals & Polyclinics

Auruvi Box handles local OPD/IPD/FEFO counters while Arenea isolates OPD paging from ICU silence.

  • Sub-10 ms wired reception & lab desks
  • HL7/ASTM analyzer direct capture
  • Wi-Fi 6 corridor chime zoning
Industrial Site Node

Factories & Yards

Arthanir gate clients log weighbridge GRNs alongside Drisva PPE/forklift vision and Arenea shift bells.

  • RS-232 weighbridge serial capture
  • On-premise RTSP safety hysteresis
  • Multi-bay acoustic horn broadcasts
Head-Office Plane

Executive & Statutory Control

CFOs, safety heads, and medical directors review branch consolidation and audit dossiers from HQ.

  • Schedule III multi-entity consolidation
  • ISO 45001 shift audit archives
  • Role-scoped access (RBAC + DoFP)
Encrypted Asynchronous Site Replication WireGuard & TLS inter-site transport · Automated local WAL snapshots · Zero dependency on public SaaS uptime

Cross-ecosystem rollout blueprints.

Tested combinations across clinical, industrial, educational, and EPC infrastructure organizations.

Auruvi Arenea Drisva

Hospital Groups & Diagnostic Networks

Combine zero-lag local-LAN OPD, IPD, FEFO pharmacy, and NABL pathology workflows with zone-isolated waiting room announcements and gate/pharmacy perimeter vision.

Explore Auruvi Healthcare →
Arthanir Drisva Arenea

Manufacturing Plants & Heavy Fabrication

Unify RS-232 weighbridge GRNs, heat-number steel traceability, PPE & forklift aisle alerts, and automated shift-change hooters directly inside plant infrastructure.

Explore Industrial ERP →
Arenea Drisva

Schools, Universities & Institutional Campuses

Deploy synchronized period bell schedules, instant exam-block silencing, rotary hall controls, mobile QR paging, and perimeter monitoring with zero copper trunking.

Explore Campus Systems →
Arthanir Drisva

EPC Infrastructure & Multi-Branch Trade

Manage CPWD/NHAI Electronic Measurement Books (eMB), 8-head RA contractor billing, MSME Section 43B(h) aging radar, and multi-warehouse dock camera analytics.

Explore EPC & Trade →

Hardware, protocol, and governance matrix.

Every Astrake deployment bridges directly into existing site instrumentation without brittle cloud intermediaries.

Facility Subsystem Supported Protocols & Standards On-Premise Execution Operational Outcome
IP Cameras & Existing NVRs RTSP, ONVIF Profile S/T, H.264 / H.265 sub-streams Processed on local Drisva Edge Node without internet uplink Real-time PPE, forklift, perimeter, and queue compliance logs
Pathology & Clinical Analyzers HL7 v2, ASTM E1381 / E1394, ZPL barcode printers Queued and verified directly on the hospital Auruvi Box Eliminates manual sample transcription and lost accession sheets
Weighbridges & Plant Gauges RS-232 / RS-485 serial, Modbus TCP, thermal receipt printers Direct Arthanir Desktop Tauri serial listener at plant gate Tamper-resistant net-weight GRN postings locked to exact paise
Facility Acoustics & Zoning Wi-Fi 6 IEEE 802.11ax, synchronized UDP timing, 30W Class-D output Arenea Studio and Node 1 controllers synced to <= 1.5 ms on LAN Clean zone announcements and automated bells with zero 100V cabling
Identity, Governance & Audit 5-Axis RBAC, L0–L5 Delegation of Financial Powers, TOTP MFA Genesis-anchored SHA-256 hash chain across financial & safety records Separation of duties, backdate locks, and verifiable audit trails
Cutover & Release Governance Tally / SQL / CSV migration, WireGuard site sync, SHA-256 releases Automated pre-upgrade local snapshots with safe rollback Predictable zero-downtime transitions from legacy desktop systems

Four-phase commissioning from audit to handover.

Structured engineering checkpoints ensure existing operations stay online throughout transition.

Phase 01

Site, LAN & Protocol Assessment

Audit existing switch topology, Wi-Fi coverage, ONVIF/RTSP streams, weighbridge or lab serial ports, and Chart of Accounts structure.

Phase 02

Appliance Staging & Data Migration

Pre-load hardened Linux appliances, import verified opening balances, item catalogs, or patient masters, and run pre-delivery integrity checks.

Phase 03

On-Site Commissioning & Training

Install hardware on your local rack or wall zones, calibrate rules and audio levels on-site, and train clinical, store, and finance operators.

Phase 04

Signed Releases & Direct SLA

Deliver encrypted automated backup schedules, signed software updates, and direct escalation to Astrake engineers in Kolkata.

Plan a multi-site rollout with Astrake engineering.

Share your site locations, existing camera or analyzer hardware, and statutory modules for a tailored architecture proposal.