Multi-block campuses & active hospitals
Avoid cutting walls, disrupting patient wards, or trenching paved courtyards for long 100V speaker cables.
Objective procurement, cabling, zone-control, and lifecycle cost comparison — paired with the printable Arenea Node 1 and Arenea Studio hardware & software specification sheet.
| Dimension | Arenea (Wi-Fi 6) | Traditional 100V Line Copper PA | Wired Dante / PoE Network PA |
|---|---|---|---|
| Inter-Block & Floor Wiring | Zero trunk cable required — runs on existing or turnkey facility Wi-Fi 6 LAN. | Dedicated high-voltage shielded copper homeruns across corridors, walls & trenches. | Requires Cat6/Cat6A structured Ethernet pull to every single speaker node. |
| Civil & Conduit Labor | Minimal — mount Arenea Node 1 beside speaker & plug into nearest local power outlet. | High — heavy masonry chasing, PVC/GI conduit, roof trays & courtyard trenching. | Moderate-High — dedicated PoE switch closets + ceiling cable pathways. |
| Independent Zone Control | Native per-unit volume, mute, dial lock, schedule groups & Wing Exam Silence. | Often shared multi-room taps; individual zone isolation needs costly matrix frames. | Per-zone capable but priced per enterprise DSP license & PoE endpoint. |
| Voice Clarity & Bandwidth | Wideband digital audio with ≤ 1.5 ms multi-zone acoustic sync. | Bandwidth-limited 100V line transformers prone to hum on damaged outdoor runs. | Wideband digital Ethernet; requires managed IGMP multicast PoE switch config. |
| Control Interfaces | Desktop Studio + Reception Touch Kiosk + Mobile QR Host (zero mobile app install). | Hardware gooseneck desk console locked at reception rack. | Desktop software or proprietary wall panels; no instant zero-install QR mobile mic. |
| Recurring Software Fees | Zero mandatory SaaS or per-zone subscription charges. | Zero software fees (no automation without add-on timers). | Often bundles cloud controller or per-endpoint annual software seats. |
| Expansion Time | Add new building/wing in hours by powering a new Arenea Node 1 on the facility LAN. | Requires shutting corridors and pulling fresh armored copper back to main rack. | Requires spare PoE switch ports and fresh structured Cat6 termination. |
Avoid cutting walls, disrupting patient wards, or trenching paved courtyards for long 100V speaker cables.
Silence exam blocks while junior corridors ring normally, or split factory floor shift sirens from quiet QC offices.
Keep voice paging, chimes, and timetables 100% locally controlled on premises with zero recurring per-speaker subscription.
Share your block count, speaker zones, and campus layout — our engineers will prepare an exact Arenea deployment schedule and turnkey quotation.